0 ft — −100 — −200 — −300 ft
SUBMERSION DATA CENTERS, INC. · A DELAWARE C-CORP · PATENT PENDING

The ocean is the coolant.The platform is the power plant.

Patented submersible-barge deployment puts sealed AI data centers on the seabed — cooled for free, powered by repurposed Gulf of Mexico platforms.

1.01–1.15
PUE · VS 1.55 LAND AVG
0
WATER USE · WUE = 0
6–18 mo
DEPLOYMENT · VS 2–5 YRS
$14.6B
SUBSEA DC MARKET BY 2035

Land has run out of room

Cooling eats 30–40% of onshore OPEX. Freshwater permits are being refused. Grid interconnects queue for years.

30–40%
of total data center OPEX is spent regulating heat — up to 55% of electricity consumed.
1.5B gal
of freshwater per year per 100MW. Operators face permit refusals across TX, AZ, and the Southeast.
5–7 years
average grid interconnect queue. Land near fiber hubs costs $1M–$10M per acre. Electricity costs skyrocketing.

One barge, five steps, no heavy-lift vessels

Submersion Data Centers is a turnkey EPIC company: we engineer, procure, install, and commission the entire system.

1
Platform selection
Near-shore platforms with existing power generation and gas pipeline access.
2
Plug & abandon
Industry-leading well P&A and decommissioning experience clears the site.
3
Power & fiber
Upgraded generation, medium-voltage umbilical, shore-to-platform fiber.
4
Deploy the barge
Ballast down, connect, commission — no heavy-lift vessels required.
5
Client operates
Keys handed over; no dive or heavy lift vessel required for maintenance, repair, or demob.

The economics compound

Co-locators / Hyperscalers cut power costs ~38% with zero water use; O&G platform operators convert idle liabilities into cash flow.

$620M
5-yr EPIC + P&A revenue
$58M
Year-5 EBITDA
$5–6M/yr
client OPEX savings per 24 MW
$27M+
10-yr NPV per platform operator